The first three options A1, B1, and C1 are shown as if the dam has remained in place for 30 years.  Each of these Options is followed by additional drawings (A2, B2, C2) that show what would happen to the first pictures when the dam is removed.  The fourth Option (D) shows what the Mirror Pond reach could look like (30 years from now) if the dam were removed as part of that option.

The window below will give you background information on the costs and impacts associated with each option.

A little history: Previous Visions and Options

The Mirror Pond Downtown and Redevelopment Concept

Scroll through the images below to see the impacts of dam removal on each of the Options.

Mirror Pond Project

On behalf of the Mirror Pond Ad Hoc Committee, Steering Committee and Management Board 

For more detailed information about:
"The Mirror Pond and Downtown Redevelopment Concept" click here.

Here are the conceptual drawings.